Fields

General

A

Avg. Qty. Usage in Period

Calculated average usage quantity in the usage period.

Calculation

“Quantity Usage in Period” / Workdays

Avg. Stock Value Calculated

Displays the calculated average stock value.

Calculation

a) Reordering Policy = Fixed Reorder Qty. (Safety Stock Qty.+ Reorder Qty. Calculated / 2) * Unit Cost

b) Reordering Policy = Maximum Qty. (Safety Stock Qty.+ (Maximum Inventory Current – Safety Stock Qty.) / 2) * Unit Cost

Avg. Stock Value Current

Shows the current average stock value.

Calculation

a) Reordering Policy = Fixed Reorder Qty. (Safety Stock Qty.+ Reorder Qty. Current / 2) * Unit Cost

b) Reordering Policy = Maximum Qty. (Safety Stock Qty.+ (Maximum Inventory Current – Safety Stock Qty.) / 2) * Unit Cost

Avg. Stock Value New

Displays the new average stock value.

Calculation

a) Reordering Policy = Fixed Reorder Qty. (Safety Stock Qty.+ Reorder Qty. New / 2) * Unit Cost

b) Reordering Policy = Maximum Qty. (Safety Stock Qty.+ (Maximum Inventory New – Safety Stock Qty.) / 2) * Unit Cost

C

Calendar Days

The no. of calendar days in the usage period.

Calculation

In case of the median, the number of calendar days is the median of the individual usage periods.

D

Dampener Period Current

Specifies the current period of time during which you do not want the planning system to propose to reschedule existing supply orders.

Dampener Quantity Current

Specifies the current dampener quantity to block insignificant change suggestions for an existing supply, if the change quantity is lower than the dampener quantity.

Description

Specifies the description of the item to be calibrated.

Description 2

Specifies the description 2 of the item to be calibrated.

E

Ending Date

Specifies the ending date for the currently selected period.

Calculation

In the case of the median, the ending date is the earliest start date of the usage periods.

L

Last Direct Cost

Specifies the most recent direct unit cost of the item.

Lead Time Calculation Current

The current value of the lead time calculation.

Lead Time Calculation New

The new value of the lead time calculation. This value is written back to the master data when the planning calibration is issued.

Location Code

Specifies a code for the location where the items are registered.

Lot Accumulation Period Current

Defines the current period in which multiple demands are accumulated into one supply order when you use the Lot-for-Lot reordering policy.

I

Inbound Whse. Handling Time

Indicates the time required to add items to the available inventory after the items have been booked as “delivered”.

Calculation

The calculation basis is the corresponding location. Without Stock Keeping Unit, the location from the company information applies. If no suitable location was found, the inventory setup applies.

Include Inventory

Includes inventory in the projected available balance when replenishment orders are calculated.

Item No.

Indicates the number of the item concerned, according to the series of numbers defined.

M

Maximum Inventory Calculated

Calculated maximum inventory level by the planning calibration.

Maximum Inventory Current

The current value of the maximum inventory.

Maximum Inventory New

The new value of the maximum inventory. This value is written back to the master data when you issue the planning calibration.

Calculation

Reorder Point * (1 + Surcharge from demandPlus+ Setup/100%) Rounded with rounding precision

Maximum Order Quantity Current

Specifies the current maximum allowable quantity for an item order proposal

Minimum Order Quantity Current

Defines the current minimum allowable quantity for an item order proposal

N

No. of Orders Calculated

Indicates how often the reorder quantity is ordered, based on the calculated reorder quantity.

Calculation

“Quantity Usage in Period” / “Reorder Qty. Calculated”. Rounded up to whole orders.

No. of Orders Current

Indicates how often the reorder quantity is ordered, based on the current reorder quantity.

Calculation

“Quantity Usage in Period” / “Reorder Qty. Current”. Rounded up to whole orders.

No. of Orders New

Indicates how often the reorder quantity is ordered, based on the new reorder quantity.

Calculation

“Quantity Usage in Period” / “Reorder Qty. New”. Rounded up to whole orders.

No. of Orders placed

The no. of orders placed during the usage period. When you drill down, the corresponding purchase orders are displayed. The same functionality can be found in the item card.

Calculation

All active and archived purchase orders within the consumption period. In the case of the median, the number of orders is the median of the individual usage periods.

O

Order Multiple Current

Defines the current parameter used by the planning system to modify the quantity of planned supply orders

Overflow Level Current

Specifies the current quantity you allow projected inventory to exceed the reorder point, before the system suggests to decrease supply orders.

P

Plan. Calib Shortcut 1

Shortcut 1 value, as configured in demandPlus+ setup.

Plan. Calib Shortcut 2

Shortcut 2 value, as configured in demandPlus+ setup.

Plan. Calib Shortcut 3

Shortcut 3 value, as configured in demandPlus+ setup.

Plan. Calib Shortcut 4

Shortcut 4 value, as configured in demandPlus+ setup.

Q

Quantity Indicator

Displays the largest difference between the calculated values and the current/new values. The corresponding threshold values are stored in the bitmap setup.

Quantity Usage in Period

Calculated usage quantity in the usage period.

Calculation

Total of all item ledger entries within the usage period with the following entry types: sales, consumption and assembly consumption. In the case of medians, the usage in the period is the median of the individual usage periods.

R

Reorder Point Calculated

Reorder point calculated by the planning calibration.

Calculation

Reorder Point = A * (B+C) * D + E A = Avg. Qty. Usage in Period B = Lead Time Calculation in days C = “Inbound Whse. Handling Time” in days D = (1+Surcharge from demandPlus+ Setup/100%) E = “Safety Stock Quantity” Rounded with rounding precision

Reorder Point Current

The current value of the reorder point.

Reorder Point New

The new value of the reorder point. This value is written back to the master data when you issue the planning calibration.

Reorder Quantity Calculated

The calculated value of the reorder quantity.

Calculation

For the exact calculation of the reorder quantity see Inventory Costs

Reorder Quantity Current

The current value of the reorder quantity.

Reorder Quantity New

The new value of the reorder quantity. This value is written back to the master data when the planning calibration is issued

Reordering Policy Current

Indicates the current reordering policy

Replenishment System Current

Indicates the current replenishment system.

Rescheduling Period Current

Defines the current period within which any suggestion to change a supply date always consists of a Reschedule action and never a Cancel + New action.

Rouding Precision

Specifies the rounding precision of the item.

S

Safety Lead Time Current

Defines the current date formula to indicate a safety lead time that can be used as a buffer period for production and other delays.

Safety Stock Quantity Current

The current value of the safety stock quantity.

Safety Stock Quantity New

The new value of the safety stock quantity. This value is written back to the master data when the planning calibration is issued.

Source Type

Specifies the source type for the Source No. displayed in the “Item No.” field. Can be either “Item” or “Stock Keeping Unit”. When working with Locationfilter or Variant Filter, the system expects inventory data.

Stock Value Indicator

Displays the largest difference between the calculated values and the current/new values. The corresponding threshold values are stored in the bitmap setup.

Starting Date

Specifies the starting date for the currently selected period.

Calculation

In the case of the median, the starting date is the earliest start date of the usage periods.

T

Time Bucket Current

Specifies the current time period that defines the recurring planning horizon used with Fixed Reorder Qty. or Maximum Qty. reordering policies.

U

Unit Cost

Specifies the cost per unit of the item.

V

Variant Code

Specifies the variant of the item.

Vendor Name

Specifies the vendor name of who supplies this item by default.

Vendor No.

Specifies the vendor code of who supplies this item by default.

W

Workdays

The number of workdays within the usage period.

Calculation

The basic calendar from the corresponding location is used as the basis for calculation, if possible. Otherwise, the basic calendar from the company information is used. Without a basic calendar, no planning calibration can be calculated. In the case of the median, the workdays is the median from the individual usage periods.

Planning Calibration

Checked

User can indicate, that the line has been checked. All indicators are green.

No. of Periods with Consumption

Shows the number of periods with consumption.

Period Lines

Active

Shows whether the line is active or not. If the calculated values are transferred to planning calibration, the corresponding line is active. If there is more than one usage period, the median is always active in the calculation.

Type

Specifies whether the line was calculated based on the period or the median.

Shortcut Fields

It is possible to transfer fields from the item table or Stock Keeping Units to all areas of the planning calibration. You can find the setup either in the Assisted Setup or in the demandPlus+ setup.

Last updated