Fields

To create as much transparency as possible, all relevant fields are explained and described.

A

chevron-rightAttached to Line No.hashtag

Specifies the line no. of the module, this line is attached to.

B

chevron-rightBOM Quantityhashtag

Specifies a factor in case of a production bom. This includes possibly scrap.

Calculation

BOM Quantity = A * B * C A = Quantity per B = 1 + scrap % (from BOM) / 100 C = BOM Quantity (if Production BOM within Production BOM) If working without Type = Production BOM then BOM Quantity = 1 In case of a work center or machine center BOM Quantity = 0

C

chevron-rightCalculation Quantity (Base)hashtag

Specifies the quantity used to calculate purchase prices and expected operation cost amt.

Calculation

see: Quantity/Cost Logic

chevron-rightCost Amount (LCY)hashtag

Specifies the total cost of the the item or resource on the line.

Calculation

a) In case of an item Cost Amount (LCY) = Unit Cost (LCY) * Quantity

b) in case of work center or machine center Cost Amount (LCY) = Expected Operation Cost Amt.

c) In the case of a module, the Cost Amount (LCY) is the sum of the “cost amounts (LCY)” of all related modules, items, work centers and machine centers.

D

chevron-rightDescriptionhashtag

Specifies a description of the precalculation structure line.

chevron-rightDescription 2hashtag

Specifies a description 2 of the precalculation structure line.

chevron-rightDirect Cost Amounthashtag

Specifies the total cost of the the item or resource on the line.

Calculation

a) In case of an item Direct Cost Amount = Direct Unit Cost * Quantity

b) In case of work centers or machine centers Direct Cost Amount = Expected Operation Cost Amt.

c) In the case of a module, the “Direct Cost Amount” is the sum of the “direct cost amounts” of all related moduls, items, work centers and machine centers.

chevron-rightDirect Unit Costhashtag

Specifies the cost of one unit of the selected item or resource.

Calculation

a) In case of item see Quantity/Cost Logic

b) In case of work center group or work centers, the purchase price from the master data is used.

c) In the case of a module Direct Unit Cost = Direct Cost Amount / Quantity

E

chevron-rightExpected Capacity Ovhd. Costhashtag

Specifies the capacity overhead.

Calculation

see Quantity/Cost Logic

chevron-rightExpected Operation Cost Amt.hashtag

Specifies the total cost of operations.

Calculation

see Quantity/Cost Logic

chevron-rightExplode Stock Itemshashtag

Indicates whether stock production will be exploded. If this field ist activated, all items with a production bom and “Replenishment System” = “Prod. Order” are exploded. Otherwise, the “Manufacturing Policy” must be “Make-to-Order”.

F

chevron-rightFixed Scrap Quantityhashtag

Specifies the fixed scrap quantity.

I

chevron-rightInclude all Item Vendorshashtag

Specifies whether pricing is done for all item vendors. Otherwise, only the vendor of the item/sku is used.

chevron-rightItem Category Codehashtag

Specifies the category that the item belongs to.

chevron-rightItem Scrap %hashtag

Specifies the percentage of the item that you expect to be scrap in the manufacturing operation. This is the scrap deposited on the item. This is only taken into account in the case of a module. (See e.g. Quantity field) In other cases, this is purely informative information.

L

chevron-rightLevelhashtag

Specifies the level of the exploded BOM.

M

chevron-rightMove Timehashtag

Specifies the move time according to the value in the Move Time Unit of Measure field.

N

chevron-rightNo.hashtag

Specifies the number of the involved entry or record, according to the spefified number series

chevron-rightNo. of Setup Processeshashtag

Specifies the number of setup processes required to produce the calculation quantity (base).

Calculation

a) Maximum Order Quantity = 0 No. of Setup Processes = 1

b) Maximum Order Quantity > 0 No. of Setup Processes = Roundup(A / B) A = Calculation Quantity (Base) B = Maximum Order Quantity

O

chevron-rightOperation No.hashtag

Specifies the operation number for this routing line.

P

chevron-rightPrecalculation Schema Template Codehashtag

Specifies the precalculation schema template, which will be used for the created precalculation schemas.

chevron-rightProduction BOM No.hashtag

Specifies the number of the production BOM that the item represents.

Q

chevron-rightQuantityhashtag

Specifies the sum of components/time required to produce the parent item.

Calculation

a) In the case of an item or a module Quantity = A * B * C * D * E * F + G A = Quantity per B = BOM Quantity C = Quantity (of the module) D = 1 + item scrap % (module) / 100 E = 1 + scrap % (component) / 100 F = 1+ Scrap Factor % (Accumulated) (routing) G = Fixed Scrap Quantity (Accumulated) (routing)

b) In case of a work center or machine center Quantity = A + B * (C * D * E +F) A = Setup time B = Run time C = Quantity base (module) D = 1 + Scrap Factor % (Accumulated) E = 1 + Item scrap % (module) / 100 F = Fixed Scrap Quantity (Accumulated)

chevron-rightQuantity (Base)hashtag

Specifies the sum of components in its base unit that are required to produce the parent item.

chevron-rightQuantity perhashtag

Specifies how many units are required to produce the parent item.

Calculation

a) In the case of an item or a module, the “quantity per” is the quantity from the production BOM.

b) In the case of a work center or work machine center Quantity per = Quantity / Quantity (Base) (module)

R

chevron-rightRouting No.hashtag

Specifies the number of the production routing that the item is used in.

chevron-rightRun Timehashtag

Specifies the run time of the operation.

S

chevron-rightScrap Factor % (Accumulated)hashtag

Specifies the Accumulated. Scrap factor % from the routing.

chevron-rightScrap %hashtag

Specifies the percentage of the item that you expect to be scrap in the manufacturing operation. In the case of an item or module, the field is transferred from the production BOM. In the case of a work center or machine center, the field is transferred from the routing.

chevron-rightSetup Factorhashtag

Specifies a factor that is used to calculate the expected operation cost amt. This is calculated from the number of setup processes and the calculation quantity (base).

Calculation

No. of Setup Processes / Calculation Quantity (Base)

chevron-rightSetup Timehashtag

Specifies the setup time of the operation.

T

chevron-rightTotal Quantity (Base)hashtag

Specifies the required total quantity (related to the complete calculation) of an item in the base unit. This field is filled only in case of an module or item and is used in pricing to take into account quantity scales. (See Direct Unit Cost field)

chevron-rightTypehashtag

Specifies the type of the precalculation structure line.

U

chevron-rightUnit Cost Calculationhashtag

Specifies which unit cost calculation should be made. This field is transferred from the work center.

chevron-rightUnit Cost (LCY)hashtag

Specifies the cost of one unit of the item or resource on the line.

Calculation

a) In case of item, work center, machine center the corresponding field “Unit Price” from the master data is used.

b) In case of a module Unit Cost (LCY) = Cost Amount (LCY) / Quantity

chevron-rightUnit of Measure Codehashtag

Specifies how each unit is measured, such as in pieces or hours.

V

chevron-rightVariant Codehashtag

Specifies the variant of the item on the line.

chevron-rightVendor No.hashtag

Indicates the number of the vendor for which the lowest price was found. Especially in case all item vendor are taken into account in the price determination, the vendor no. may differ from the “main vedor”.

W

chevron-rightWait Timehashtag

Specifies the wait time according to the value in the Wait Time Unit of Measure field.